Date Workshop Site
2nd December 2001
11th November 2001  
7th October 2001 The inside of the running shed - showing the plant store & forklift undergoing repairs. A view from the end of the running shed, showing the groundwork conditions as the trackwork approaches the shed. And from the other direction - the tandem point needed given the space remaining is almost complete.  The road to the right is an unloading road, and possibly access to the museum building.
1st September 2001 Workshop external features now complete Trackwork within the building is progressing Trackwork detail in the workshop - concrete is due to be poured soon.
19th August 2001  
3rd August 2001 JCBs work inside the building, levelling the floor  
14th July 2001 Workshop roof now in place. Pit & Carriage Shed.
30th June 2001 Cladding work on the main shed now well advanced The pit can be seen under construction here, also note the floor slab being prepared - this area will be the paint bay

10th June 2001

The roof & sides of the main workshop area are now obvious - roof soon to be added to the carriage shed area

Another internal view - this time, the scale of the building is more obvious - look at the fire door on the rear wall!

11th May 2001

 

The size of the building is now fully apparent.  The main steelwork is now complete, with only the light steelwork to support the cladding to be added.

Another different view - this time from the corner of the building, where the machine shop will be located.  The mass of steelwork making up the structure is overwhelming.  Also note the overhead crane in situ.

28th April 2001 Steelwork demonstrates the size of the new building, and the rate of progress Steelwork for the museum building unloaded onto site.

16th April 2001

Overview of the workshop site.  Foundations for the main workshop area now complete, and good progress is being made with the running shed area

Museum steelwork being unloaded into museum building footprint

1st April 2001

Different view this time.  Here's the overhead crane.  You should be able to see the excavations for the foundations around it.

Once again, a different view - you can see the levelled ground.  No building action is expected here for a few weeks yet.  The track visible will be removed in the next couple of weeks

24th March 2001

Contractors cabins now visible, and the overhead crane in situ

No Museum shot this time - but here's the overhead crane, on site & repainted ready for the building to be erected around it

4th March 2001

Overhead crane has been assembled, and placed in the building's footprint, ready for the foundations to be built around it

Note that the lighting column has been removed, and the museum steelwork is ready to be unloaded

25th February 2001

Site of the new workshop building.

Groundwork is underway, and site levelling is in progress